Proudly Constructed by IBEW-NECA Teams

Bobcats Arena

 

   

 

 

Piedmont Town Center - new home of Piedmont Natural Gas. Five floors of class A office upfit. Complete core electrical with two generators, one diesel and one natural gas generator just for Piedmont Natural Gas.  Service was 4000 amp double utility fed from Duke Power with diesel genset as emergency power source . Work included all base panels, transformers, fire alarm, and HVAC systems for the entire building.

5000Amp Service

 

 

Polar Plastics -  designed and installed the power distribution system, including 3000 amp and 5000 amp services for an injection molding facility located in Mooresville, NC. Included in this system was the installation of busway, switchgear, chillers, chill water tanks, and controls.

Transport Conveyor System

 

 

 

Spencer Gifts, Inc - provided all motor and device wiring for the materials  handling transport conveyor systems.

 

 

 

Time Warner Cable - new data center and four-floor office upfit to existing building; under ground duct bank to two new two mega watt caterpillar generators and one new utility transformer. The duct bank feeds a new double ended four thousand amp closed transition paralleling switchboard.